Strategic bidding in a primary reserve auction

Palvolgyi, D and Csapo, G and Wortel, M (2011) Strategic bidding in a primary reserve auction. [Study Group Report]

[img]
Preview
PDF
311kB

Abstract

Electricity grids are subject to a constant change of demand. If a power line is overloaded, the demand is rerouted to another line, which is then also likely to overload due to the sudden spike in voltage. Due to this cascading effect a grid-wide blackout is not at all improbable; one occurred in Italy in 2003. The costs of such a blackout are immense in today’s modern society. Transport and telecommunication systems have such a high power demand that a backup power generator system would come at a very high cost. To solve this, Germany requires the electricity grid operators to have Primary Reserve Capacity on standby...

Item Type:Study Group Report
Problem Sectors:Discrete
Energy and utilities
Study Groups:European Study Group with Industry > ESGI 79 (Amsterdam, Netherlands, Jan 24-28, 2011) (SWI 2011)
Company Name:Statkraft